About This Project
CHC Mechanical was selected for the 13,000-square-foot total renovation of the Tennessee Residence. Included in the project scope was a complete removal and re-piping of the domestic plumbing system, including all drainage piping, water piping and new updated fixtures for the entire house.
Mechanically, CHC provided and installed 15 different water-source heat pump units connecting the new geothermal field. The finished installation provides far superior room and zone control, taking advantage of a high-efficiency system that has resulted in a reduction in energy consumption by more than 50%.